✉news EnvironmentEnergy first seen 13 h ago, last 8 min ago, peak #1
Gassi and Lamadji unlock €37.9m solar and storage financing
Original: Gassi and Lamadji reach first drawdown on a €37.9m solar and storage package
Gassi and Lamadji have reached the first drawdown on a €37.9 million financing package for a combined solar and energy storage project. The milestone means construction funding can now be released under the agreed terms. The deal adds to a growing pipeline of utility-scale renewables projects pairing solar generation with battery capacity to firm up output.
Why now: First drawdown milestones signal a major clean energy project moving from financing into delivery.
Rank over time, top of the chart is #1. 11 snapshots from 13 h ago to 8 min ago.
Evidence
- Gassi and Lamadji reach first drawdown on a €37.9m solar and storage package · Energy News Network
API: https://socialmediatrends-api.osmike.com/v1/trends/959137