GgoogleES first seen 6 d ago, last 4 d ago, peak #3
Tunnel boring machines in the spotlight across Spain
Original: tuneladora
Two tunnel boring stories are drawing attention in Spain. In Madrid, workers excavated 2,732 metres of tunnel in just 147 days, removing nearly 189,000 cubic metres of earth. In Barcelona, residents of the Putxet district are urging the Catalan government to reactivate the tunnel boring machine on the L9 metro line after Christmas, reviving a long-running infrastructure debate.
Why now: Major metro tunneling milestones in Madrid and calls to resume Barcelona's stalled L9 works have put tunnel boring machines back in the news.
MadridBarcelonaGeneralitat de CatalunyaL9 metro linePutxet
Rank over time, top of the chart is #1. 9 snapshots from 6 d ago to 4 d ago.
Evidence
- Excavaron 2.732 metros bajo Madrid en solo 147 días y retiraron casi 189.000 metros cúbicos de tierra · Canal26
- Los vecinos del Putxet piden a la Generalitat que la tuneladora de la L9 se reactive después de Navidad · El Periódico
API: https://socialmediatrends-api.osmike.com/v1/trends/2907304